best magento templates for your store designed by zingthemes.com, vietnam visa services, vietnam visa home, vietnam visa trip, magento templates, best magento templates for your store, bestmagento templates, 2 cong ty bao ve, 2 dich vu bao ve, 2 bao ve, thoi trang, thoi trang, website chinh phu viet nam, cong thong tin chinh phu viet nam gia vang hom nay, web design blog tin tuc, suc khoe doi song, tin tuc moi online, tin moi 360, tin tuc online, giai tri 24h thiet ke website, thu thuat cong nghe, thoi bao cong nghe, dien thoai sky gia re, magento themes, euthemes.com, themetalent.com, wpdance.com

Environment

ENVIRONMENT

 

Eskom Ingula Pump Storage Scheme

Download Public Participation Documents
  • Appendix A – Locality Map
  1. Ingula layout map_1
  2. Ingula layout map_2
  1. Devils Culvert proposal 1 – stilling pool.pdf
  2. Devils Culvert proposal 2 – stilling drops.pdf
  3. Sewer crossing options.pdf
  4. Various river crossings options.docx
  5. WTP Crossing option A.pdf
  6. WTP Crossing option B.pdf
  • Appendix D – Specialists Studies
  1. Heritage Impact Assessment Report.pdf
  2. Ecology Assessment Report.pdf
  3. Ingula quarterly report October 2013.pdf
  4. Ingula annual biomonitoring report 2011.pdf
  5. Ingula-November-Biomonitoring-Report.pdf
  6. Soil and Agriculture Potential Assessment Report.pdf
  7. Ingula Visual Impact Opinion Report.pdf
  • Appendix E – Public Participation Documents
  1. 1. BACKGROUND INFORMATION DOCUMENT INGLUGA
  2. 1.1 INGULA BID September 2013_Zulu translation
  3. 2. NOTICE OF APPLICATION FOR EXEMPTION   21 October2013  comments
  4. 2.2 NOTICE OF APPLICATION FOR EXEMPTION   21 October2013  Zulu Translation
  5. 3. Email Notification
  6. 4. SMS Notifications
  7. 5. Ingula S24G STW stakeholder database
  8. 5.1 Ingula S24G STW stakeholder meetings register
  9. 6. Photo plate Ingula PPP
  10. 7. Exemption letter

 

Environmental Management System ISO 14001:2004

   Download Environmental Policy

Project: Sere Wind Energy Facility, Western Cape Province

Application for amendment of Environmental Authorization (DEA REF NO: 12/12/20/913): Construction of the Proposed Wind Energy Facility, Western Cape.

   Download Environmental Documents

Project: Integrated Waste Management Licence Application for the Kusile Coal Fired Power Station.


Draft scoping report for public comment

   Download Environmental Documents
Appendix A 2006 EIR

Appendix B 2006 EMP r

Appendix C 2006 EA

Appendix D 2010 Waste license

Appendix E Design Reports

Appendix F Flow Diagram

Appendix G Section 21 GWULA

Appendix HI & APs

Appendix I Specialist Reports

Final Draft Scoping Report